History/Timeline
The technology developed from a 2001 initiative in Rijswijk, which aimed to find a way to join tubulars quickly using alternatives to threaded connection techniques, and has since leveraged rapid non-contact non-destructive testing (NDT) and pipe handling into an integrated rig-ready system.
